New bike lanes planned for Almere Poort to improve safety
Almere Poort was laid out at the end of the 1990s for families with cars: long straight streets, wide carriageways, generous kerbside parking and a neighbourhood shopping centre within cycling distance of almost every front door. That planning logic is now being challenged. The municipality of Almere has published drawings for a package of new, protected bike lanes across the Poort district, and the stated aim is a measurable drop in serious conflicts between riders and motor traffic.
The proposal is more than a line of paint. It involves kerbs, raised crossings, relocated loading bays and the removal of a slice of on-street parking that many residents have treated as theirs since the first families moved in. For a district where a large share of trips are still made by car, that makes it one of the more consequential local planning decisions in years. What follows is a look at what is planned, where the arguments are stuck, and what other cities have learned from the same kind of rework.
What the new lanes will look like on the ground
The lanes are planned along the main spines through the Poort, where the roads are wide enough to absorb a cycle track without squeezing the carriageway down to a single lane in each direction. Instead of the painted advisory lanes that used to be the default on Dutch residential roads, the new sections get raised kerbs, a different surface colour and physical separation from moving traffic. Junctions are where most of the design effort sits: sight lines are being opened up, and drivers turning across the lane will meet a raised table or a sharper crossing.
The network is meant to read as one continuous route rather than a collection of fragments. The idea is to link the neighbourhood centre, the primary schools and the station area, then feed riders onward toward Almere Centrum and the polder roads, so that a trip of four or five kilometres no longer breaks into pieces that force a nervous rider back onto a main road. The municipality says continuity matters more than any single street: riders abandon a route the moment it dumps them into fast traffic at a junction.
Delivery and parking arrangements are part of the package, not an afterthought. Some bays disappear, some are replaced by loading zones with time limits, and a handful of spaces near the shops are being redesigned for disabled users and short-stay pickup. Because the works are being phased, riders will meet temporary barriers, unfinished kerb lines and odd angles for weeks at a time. The first section is due to be finished before the winter, with the remainder following once the traffic patterns from the opening phase have been studied.
Why safety is the argument that won support
Safety is the argument that carried the proposal through the council's traffic committee, and the reason is visible on almost every street in the district. The kerbside of the Poort is not empty: residents park half on, half off the footpath, and a cyclist filtering past a car with an open door has no way of reading the driver's intention. Council figures tabled during the discussion show a cluster of near misses at intersections, and one alderman described the pattern as the sort of conflict that ends in a hospital rather than in a story told over coffee.
Speed is the other half of the case. A street posted at 30 km/h but designed for 50 km/h traffic is not a slow street; it is a wide, forgiving invitation, and parked cars only add places for a driver to hide. The proposal closes that invitation down by taking away the margin. Research from cities that have made a similar switch generally finds that separated infrastructure is used by a broader range of people than painted lanes, including older riders, children and commuters who would rather not ride at all than fight for a strip of road.
There is also an equity argument that Dutch councils have become comfortable making: independence for children. A nine-year-old who cannot cycle to school because the fastest route runs past a line of parked cars will not simply take the bus instead. Every year the lanes are delayed, the argument gets harder to answer, because the children currently walking along those roads are the ones who will be riding them in a decade. That is also why the plan is being presented as safety infrastructure rather than as a cycling promotion project.
Where residents and the council still disagree
The consultation ran through the neighbourhood platform and a formal round of written submissions, and the responses fall into two predictable camps. One set of residents wants the lanes built quickly, pointing to the junctions where their children cross on the way to school. Another set worries about parking, trees removed to make room for kerbs, and construction that will run through the noisy season of short Dutch days. The municipality's position is that traffic counts and a before-and-after study will settle the argument once the first section is open.
Shopkeepers along the edge of the neighbourhood centre have raised the loudest objections, mostly about loading. Their deliveries arrive before the shops open, when a loading bay limited to certain hours is of little use, and a car parked across a cycle track blocks the route at the exact moment the high street is busiest. The draft answers that allow short-stay loading at set times and keep a number of bays free outside those windows, and the plans are being adjusted so a delivery vehicle can pull in without reversing across the lane.
A quieter concern came from residents with limited mobility who rely on kerbside parking near their doors, and from older people who park close to the shops. Small money also matters to the neighbourhood's own projects. Groups in the Poort have raised funds for planters, a repair café and reflective bands for the school route, often through bake sales and prize draws. Prize draws in the Italian lotto style have become a familiar fundraising trick across Europe, and organisers planning one can work through the mechanics in this guide to online lotto play before setting a date, keeping stakes modest and clear about where the proceeds end up.
What Australian riders will recognise
Melbourne riders will recognise the kerbside argument immediately. On streets like Chapel Street in Prahran, or the back streets through Carlton and Brunswick, the fight over a row of parking spaces is argued in exactly the same terms: business deliveries against school traffic, café patrons against commuters, and a lane that suddenly turns into a car corridor. Melbourne's recent run of kerb extensions, green surfacing and protected lanes threaded through tram territory produced the same cycle of resident fury, pilot data and quiet acceptance, which is roughly where the Poort plan sits now.
Sydney has its own version on Parramatta Road and through the western suburbs, where light rail and bike paths share the same alignment and every crossing becomes an argument about priority. Adelaide has stitched low-traffic back streets into bicycle boulevards, and Canberra remains the nation's friendliest administrative capital, with a shared path network that locals ride without a helmet unless they feel like wearing one. Even the language of the debate translates: an Australian rider will say plainly that you are parked in the bike lane, and there is no argument about it.
How the market works at home matters as much. Australian councils publish bike strategies, run public submission rounds and hand much of the communication to state advocacy groups such as Bicycle Network, Bike Canberra or the Amy Gillett Foundation. Local outlets survive on council notices, community grants and advertising from nearby businesses, a model much like the one that keeps a community paper such as AlmeerNieuws free for readers, with organisations and residents able to send in press releases and local updates.
Lessons from other cities facing the same kerb
Cities outside the Netherlands have run the same experiment with different traffic mixes. In Germany, towns such as Karlsruhe and Berlin removed kerbside parking in stages and published speed data afterwards; the initial wave of letters gave way to lower speeds, fewer door-opening incidents and a measurable shift of car trips to the edge of the neighbourhood. In Copenhagen, protected routes built during motorway conversions are now so ordinary that visitors barely photograph them, which is usually the sign that a scheme has worked.
The same trade-off is being argued in Ukrainian cities, where streets damaged by war are being rebuilt and the question of where a protected lane fits beside a bus stop or a market stall is a live one, as civic reporting in Ukraine follows those council decisions. The starting conditions are different, but the kerbside arithmetic is identical: a metre of space has to come from somewhere, and the argument will be about who is asked to give it up.
The lesson that travels well is unglamorous. Publish the numbers before and after, not after the complaints. Phase the work so the first section can be adjusted while it is still cheap to change. Keep loading and disabled parking settled in writing before the kerbs go in. And give drivers a clear path around the cycle track, because an obstacle course produces exactly the hesitation that the safety case was built to remove.
Practical steps before the cones go up
Anyone who rides, walks or parks in the Poort can still influence the detail, because the plans remain adjustable at street level: a crossing position, the location of a loading bay, the width of a gap at a bus stop. The decisions about kerb lines are made in the drawing office, but the awkwardness shows up on the ground, and residents are the only people who ride every one of those awkward passages before they open.
- Test the route with a child in tow or a loaded shopping trolley, because the design will be judged by how it handles the least confident rider rather than the fastest one.
- Ask for the counts: traffic volumes, speeds and near-miss locations from before the works, and the same figures six months afterwards, so the safety argument can be checked against evidence rather than impressions.
- Push for a phased pilot, with temporary kerbs and surfacing first and permanent works following once traffic patterns have settled, which spreads the cost and makes later changes cheaper.
- Get disabled parking, loading bays and bus stops written into the approved plan before the first shovel arrives, rather than negotiating them after people have moved their cars.
- Keep a dated photo log of the junction you use most, and share it with the council and local press, so there is a resident record of what actually changed.
None of that requires grandstanding or hard feelings, and it works better than the anonymous objections that arrive by the hundred. Most of the detail complaints that residents raise are small, fixable and worth catching early, while the kerbs are still on paper.
What to remember when the works begin
The opening weeks of any project like this are the loudest: unfamiliar signs, a bus stop that appears to have shifted, a corner where drivers brake later than they should. Some of that noise is useful, because a scheme that draws no attention at all has probably been designed to be ignored. The lasting change will not be the colour of the surfacing but the habit it builds, with fewer door openings, slower turns and more children riding to school on their own.
What should stay in the reader's mind is this. The Poort was built to a 1990s brief of wide roads, easy parking and short trips by car, and the lanes now being planned put a question to that brief: whether the space on a residential street should be organised around the fastest way to move, or around the safest way to move the people who are nine, or seventy, or simply not confident on a bike in traffic. The drawings will decide where the kerb lines go. What everyone who uses those streets decides afterwards will decide whether the safety gains hold.